Published fees you can count on
The City of Cape Coral's miscellaneous permit fee schedule, effective January 1, 2026, lists several fees that apply to bathroom work:
- $140 for a miscellaneous residential plumbing permit;
- $180 for a plumbing re-pipe;
- $80 for a miscellaneous electrical permit without plan review, or $220 with plan review.
The city adds a 2.5% surcharge to permits associated with enforcing the Florida Building Code, and a first re-inspection costs $48 per discipline. Tile, fixtures and labor are separate costs that only a quote can set.
Before you sign
Ask each contractor for their Florida license number, and look up the remodeler, plumber and electrician with the Florida Department of Business and Professional Regulation. Ask who will be on site each day, how they will protect the rest of the house from dust and how long the bathroom will be out of use.
Humidity control is essential
Fort Myers averages about 3,353 hours a year with the wet-bulb temperature above 73°F. In that climate, a bathroom without strong ventilation grows mildew on ceilings, grout and inside walls. Ask for:
- an exhaust fan sized for the room, ducted outdoors;
- a humidity-sensing control that runs the fan until the room dries;
- a waterproofing membrane behind shower walls and under the shower pan;
- mold-resistant backer board and grout.
Fixtures for a coastal home
Salt air pits chrome and brass finishes near open water. Ask about finishes and valve bodies made to resist corrosion, and choose fixtures with replacement cartridges you can buy locally. Ask whether a shower valve with built-in pressure balancing makes sense for your house.
The order of work
1. Design and selections. 2. Permits. 3. Demolition. 4. Rough plumbing and electrical. 5. Rough-in inspection. 6. Waterproofing, with a flood test of the shower pan if the contractor does one. 7. Tile. 8. Vanity, toilet, fixtures and glass. 9. Final inspection.
Storm-season scheduling
If the remodel runs through hurricane season, ask how the contractor will secure materials and handle delays if a storm approaches.
Comparing quotes
Ask for line items for demolition, plumbing, electrical, ventilation, waterproofing, tile, fixtures, glass, permits with surcharge and cleanup.
Records
Keep permits, inspection results and warranties together.
Exhaust ducting that works
A bath fan only helps if its air leaves the house. Ask the contractor to run the duct to an exterior wall or roof cap with a damper, not into the attic or soffit, where moist air can condense and grow mold. Ask for the fan's airflow rating and its noise rating; a quiet fan is more likely to be used.
Planning for storms during a remodel
If the work runs through hurricane season, ask how the contractor will close up open walls, protect materials and reschedule if a storm approaches. A written schedule with a plan for weather delays avoids surprises.